Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C269(Main St. & First Ave. - Mixed-use)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Crew 1 began work at locations B2–B3. The crew excavated the soil to the required depth and dimensions to accommodate the proposed manhole and storm pipe installation. A manhole was installed at B2 and connected to the existing CMP by inserting the pipe into the inlet of the manhole and aligning it to the required grade. From the manhole outlet, storm pipe installation continued in the north direction for approximately 39 feet using 24-inch diameter pipe. All pipe and manhole connections were sealed with concrete. Upon completion of the pipe installation, backfill material was placed around the manhole and pipe in lifts, and each lift was compacted. At the same time, Crew 2 continued work at location A3. The crew proceeded with backfilling operations around the previously installed structure by placing soil in lifts of approximately 6–8 inches. Each lift was compacted using a sheep-foot roller to achieve the required density. Backfilling activities were continued until the fill reached the required design elevation, completing the backfilling at this location in accordance with project specifications. Meanwhile, Crew 3 began work at location F1. The crew excavated the soil to the required depth and placed gravel bedding at the bottom of the excavation. A manhole was then installed and connected to the existing pipe. From the manhole, a storm pipe was installed in the southwest direction extending toward location F2. The gaps between the manhole and the pipe connections were sealed with concrete. Following installation, backfill material was placed around the manhole and pipe in controlled lifts and compacted. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel