Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C244(Cassville Rd tract, proposed Burrito Wrap)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
mahendra.mylabathula (Mahendra Mylabathula)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day The crew proceeded by removing soil from the pond excavation and placing it as backfill in the northeast corner of the site, covering a total of five lot areas (Lots #42, 43, 44, 45 and 46). The placed material was graded to the required elevations, and the soils were compacted. Field testing indicated the backfill material contained a slightly higher moisture content than optimum; however, operations continued as planned. Final grading of the surface was performed, followed by compaction. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you
Upload Images
Image
Description
1
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel