Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the pipe contractor (Savannah) continue installing 8" ductile iron sanitary sewer line between manhole s#15 and 16 and backfilling using rock fill and soil between manholes # 13 and 16. The backfill was observed and tested in accordance with job specifications of rock fill and soil materials. Observations and testing was found to meet job specifications. The pipe contractor also began to install 48" RCP storm line for the detention pond for the Unit 4 phase 2 OCS structure by setting the headwall structure. The writer probed the in-place fill at locations for the headwall and found them to be loose and not sufficiently compacted. The contractor was referred to recommendations made in our report dated 1/20/26 to replace core backfill around the pipe with a clay-based soil material replacing the lightweight sandy silt. The installation was cancelled today to make plans for replacement tomorrow. The water pipeline contractor also continued installing 8" ductile iron water line at Unit 4 phase 1A between building Lots #22 and 18 for a total of 280 linear feet and installing a fire hydrant at Lots #22 and 21. The grading contractor also continued placing fill for building Lots #56 thru 59. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
1Backfill between manhole # 13 and 14 and compacting
2
3
Backfill between Manhole #15 and 16
4
Density tests performed between manhole #13 thru 15
5
6
7
8" ductile iron water line installation between Lots #22 and 18
8
9
Sub grade observations at OCS headwall structure
10
11
12
Fill placement at Lots # 56 thru 59
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel