Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C269(Main St. & First Ave. - Mixed-use)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. The crew installed a new manhole at point D2 and aligned it with the existing corrugated metal pipe (CMP) coming from point D1. The connection between the CMP and the newly installed manhole was sealed using mortar. After alignment and sealing were completed, No. 57 stone was placed around the pipe and manhole as backfill. Suitable soil materials were then placed above the stone in lifts, and each lift was compacted using a double-drum roller. Crew continued work between points W1 and W2. The existing ductile iron pipe (DIP) inside manhole W1 was cut to facilitate the new alignment and connections. Manhole risers were then installed on top of the existing manholes to adjust the structures to the required finished elevation. After completing the structural work, the trench box was removed. Backfilling operations were performed using No. 57 stone around the manhole and pipe, followed by placement of graded aggregate base (GAB) as the final layer. All backfill materials were compacted using a double-drum roller and Jumping jack compactor. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Nuclear gauge test between points v0-v1
2
Sealing gap between manhole and pipe with mortar
3
Cutting the DIP inside manhole
4
Backfilling No.57 stone
5
Backfilling dirt
6
Compacting GAB using double drum roller
7
Compacting using jumping jack compactor
8
compacting with double drum roller
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel