Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. The grading crew continued placing soil lifts of approximately 12 inches in thickness across Lots #32 through #40 and #85 through #92. These lots are mainly being filled in front yards and roadways. Density testing was performed and test results were provided to the contractor. The pipe crew continued installation of SSMH 1.7 to 1.8. Lifts were installed in approximately 8 to 12 inches in thickness and compacted with a sheep-foot roller and a trench roller. Density testing was performed and test results were provided to the contractor. The wall crew continued installation of retaining wall #2. Soil lifts were placed in approximately 8-inch lifts and compacted using a vibrating sheep-foot roller. Density testing was performed and test results were provided to the contractor. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
road way 32-40 and 85-92
2
1.7 to 1.8
3
wall 2
4
curbs at decel lane
5
32-40 and 85-92
6
1.7 to 1.8
7
1.7 to 1.8
8
wall 2
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel