Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
<p data-start="0" data-end="445">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.</p> <div class="flex flex-col text-sm pb-25"><article class="text-token-text-primary w-full focus:outline-none [--shadow-height:45px] has-data-writing-block:pointer-events-none has-data-writing-block:-mt-(--shadow-height) has-data-writing-block:pt-(--shadow-height) [&:has([data-writing-block])>*]:pointer-events-auto scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto" data-turn-id="8760cc51-f6e7-411c-b7a6-e11222418248" data-testid="conversation-turn-52" data-scroll-anchor="true" data-turn="assistant"> <div class="text-base my-auto mx-auto pb-10 [--thread-content-margin:--spacing(4)] @w-sm/main:[--thread-content-margin:--spacing(6)] @w-lg/main:[--thread-content-margin:--spacing(16)] px-(--thread-content-margin)"> <div class="[--thread-content-max-width:40rem] @w-lg/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn"> <div class="flex max-w-full flex-col grow"> <div class="min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&]:mt-1" dir="auto" data-message-author-role="assistant" data-message-id="080e2509-499f-4ebb-b809-1fa5062ec7eb" data-message-model-slug="gpt-5-2"> <div class="flex w-full flex-col gap-1 empty:hidden first:pt-[1px]"> <div class="markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling"> <p data-start="0" data-end="403">The crew continued earthwork operations at Lots 53, 52, 51, and 50, where backfilling activities were carried out using suitable fill material. The soil was placed in controlled lifts of approximately 6–8 inches thickness to ensure proper compaction and stability. Each lift was spread and leveled using a crawler bulldozer, which helped distribute the material evenly across the working area.</p> <p data-start="405" data-end="689">After spreading, the placed lifts were compacted using a sheep foot roller and Caterpillar 815 compactor to achieve the required density and soil stability. The compaction process was performed systematically across the area to ensure uniform consolidation of the fill material.</p> <p data-start="405" data-end="689">During field observations, it was noted that in certain locations the fill material was placed in lifts thicker than the recommended 6–8 inches. Placing thicker lifts can make it difficult for the compaction equipment to achieve the required density throughout the entire layer. Crew continued compaction operations using the sheep foot roller and Caterpillar 815 equipment, and the areas appeared to be compacted adequately after multiple passes.</p> <p data-start="691" data-end="1138" data-is-last-node="" data-is-only-node="">After compaction, it was observed that a couple of locations did not meet the required compaction standards. In those areas, the contractor reworked the soil by loosening the material, re-compacting the lifts using the same equipment. After reworking, additional compaction passes were performed, and the areas were compacted again until the required compaction criteria were satisfactorily achieved.</p> <p data-start="922" data-end="1403"><strong>Recommended:</strong></p> <p data-start="922" data-end="1403"><strong>Back fill material in controlled lifts of each 6-8 inch.</strong></p> </div> </div> </div> </div> <div class="z-0 flex min-h-[46px] justify-start">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.</div> </div> </div> </article></div>
Upload Images
Image
Description
1
Density tests using Nuclear gauge
2
Density tests using Nuclear gauge
3
Compacting using 815 equipment
4
Density tests using Nuclear gauge
5
Density tests using Nuclear gauge
6
Compacting using Sheep foot roller
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel