Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site as requested by the contractor (NG Grading) for the observation/testing of the placement of fill/backfill. The contractors continued placing GAB in the Deceleration Lane and on the road extension. During the excavation of soil in the road extension, a white pipe exposed. This area was probe rodded and it was very soft ground. It was recommended to remove approx. 2ft x 2ft x 100ft long of the loose soil and replace with GAB to prevent any pumping on the roadway in this area. The contractors added water to the GAB and compacted the lifts with a smooth drum vibrating roller. The grading crew began the excavation of wall #1. The face of wall appears to cross the LOD stakes and is within approx. 10ft to 15ft of a small tree on the outside of the property line. This was brought to the contractors and Mr. Woods attention. The grading crew only has one entrance to allow trucks down to the wall, which has extended the time it will take to load trucks and haul out the topsoil located along the footing. DCP testing will be conducted once the footing has been excavated. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
decel lane
2
wall 1
3
pipe found in lane extension
4
lane extension
5
trees by face of wall
6
face of wall and lod stakes
7
face of wall and lod stakes
8
decel lane
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel