Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site as requested by the contractor (NG Grading) for the observation/testing of the placement of fill/backfill. The grading crew continued removal of topsoil from the footing of wall #1. This area appears to have PWR present in the footing. DCP testing will be conducted once the footing has been excavated. The grading crew placed topsoil along the slopes of lot #19 - #22. this area showed a serve amount of pumping present. Because the pumping was within 10ft of a house pad, it was recommended to remove the topsoil and replace with structural fill. The contractor agreed and excavated the topsoil and placed it further back on the slope. The paving crew is finishing last touches to the deceleration lane before the proof roll tomorrow morning. The pipe crew began backfilling SSMH 2.2 to 2.3. Soil was installed in approx. 8in to 12in lifts and compacted with a combination of a trench roller and a vibrating sheep's foot roller. Density testing was conducted and test results were provided to the contractor. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
wall 1
2
lots 17 - 22 area
3
pipeline
4
pipeline
5
pipeline
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel