Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C103(NW PH 2, UNIT 4)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and observed the Pipe contractor continue installing 8" ductile iron sanitary sewer line between manhole structures #7 and 8.The writer observed backfilling at deep elevations which was placed and compacted in suitable lifts.The contractor had installed sanitary sewer line from halfway between manhole # 4 and 5,also from #5 thru 7 on 3/7/26 without the writer present onsite. The Grading contractor continued placing rock fill at building lots# 33 thru 36 that was monitored by the writer at elevation 902. The observed rock fill placement was suitable for site specifications. The Blast contractor (Advance) made a blast shot today at lots# 45 and 46.The blast drill log is attached.
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel