Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. The pipe crew installed storm line to approximately AA-14. This area consisted of a large quantity of PWR present in the backfill material. As previously recommended, the contractors mixed a finer structural fill material into the PWR during backfill. This area was visually inspected, and probe-rodded to check the stability of the area. Our representative was unable to drive the nuclear density gauge pin into the ground in this location due to the large amount of rock present. Backfill was placed in approximate 1.5 foot to 2-foot lifts due to rock size and was compacted with a combination of a trench roller and a large sheep-foot roller. The grading crew began placing soil lifts with a large quantity of PWR across the previously excavated slope area of Lots #19 through 22. The contractor placed lifts approximately 1 foot thick and compacted with an 815 sheep-foot roller. ASEC watched as loaded off road trucks rolled across the lift to check stability. There were no signs of severe pumping or deflection present at this time. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
pipeline backfill
2
backfill material mixed with finer soil
3
lot 19 - 22 slope
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel