Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
<div class="row"> <div class="col-sm-6">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.</div> </div> <div class="view_cnt"> <p data-start="95" data-end="520">During a concrete pour for the retaining wall, field quality control tests were performed including temperature, slump, unit weight, air meter, and concrete cylinder sampling. All tests were performed in accordance with standard procedures, and cylinders were cast for strength verification.</p> <p data-start="522" data-end="871">On the other side of the site, backfilling operations continued for Lots #37, 38, and 39. The backfill material was placed in lifts of approximately 6–8 inches thickness and spread using a crawler bulldozer. Each lift was compacted using a sheep-foot roller and Caterpillar 815 compactor.</p> <p data-start="873" data-end="1013">At Lots #17 and 18, the crew carried out stripping operations where the topsoil was removed and relocated as part of site preparation activities.</p> <p data-start="1015" data-end="1437">In the neighboring Buford area, the crew continued excavation activities and encountered rock during the process. A rock grinder attachment connected to a hydraulic excavator was used to break and remove the rock. Excavation was carried out to a depth of approximately 8–10 feet, with a trench width of about 6–8 feet and extended to a length of approximately 10–15 feet, progressing as required for the installation work.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you. </div>
Upload Images
Image
Description
1
2
3
4
5
6
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel