Density test report
Date
*
Project Number
*
2026C103(NW PH 2, UNIT 4)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above our representative was on site to observe the pipe contractor continue backfilling 30" RCP storm line between manholes #B6, B7 and B10. The backfill was observed by probing in-place compacted fill using a rounded end steel rod. Compacting efforts observed were suitable for required job specifications. The paving contractor was on site and continued subbase stone placement and subgrade repairs between sanitary sewer manholes #9 and 6. The contractor bladed and compacted base stone wetting and compacting using a vibratory smooth drum roller. The contractor also performed subgrade preparation between sanitary sewer manholes #6 and 4 to observe for proof-rolling. The subgrade was proof-rolled using a loaded tandem dump truck loaded with 18 tons of base stone. Several isolated areas were observed having slight to moderate movement under traffic and was recommended for clipping -2" to -8" and replacing with additional base stone and geotextile fabric as needed. All areas were identified by spray paint and will be observed during clip removal. The curbing contractor was on site and formed and poured bases for single and double wing curb inlets at Nature Walk Boulevard between sanitary sewer manholes #9 and 6. The grading contractor worked at Nature Walk Boulevard backfilling outside curbing and inside island curbing. The water line contractor was also on site and continued installing and backfilling 8" ductile iron water line between sanitary sewer manholes #9 and 10. The drilling contractor (Advance) was on site and continued drilling at Lot #37 using two drill rigs. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Adding additional base stone at repair areas
2
Proof rolling sub grades
3
Proof roll observation of moderate movement
4
Proof roll observing slight movement
5
Grading contractor backfilling curb
6
Curbing contractor forming base for inlets pour
7
Water line contractor installing 8" water d.i.p. line
8
Drill rigs at lot #37
9
Backfill and compacting r.c.p. 30" storm line
10
Back fill observation and probe testing
11
Backfill observations and probe testing recommended for additional compacting
12
Backfill observation probe testing
13
Backfill observations probe testing recommended additional testing
14
Backfill observations probe testing, all compacting efforts after additional rolling was suitable for compaction requirements.
15
Backfill observation probe testing.
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel