Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. The pipe crew continued installation of storm line 3.1 to 3.2. Backfill was placed in approximate 1-foot lifts and compacted using a sheep-foot roller and a trench roller. Density testing was performed and test results were provided to the contractor. The grading crew continued to assist the wall crew in installing retaining wall 1. The wall crew has expressed complaints of the footing not being over excavated past the face of the wall stakes. They are removing approximately 6 inches of soil along the face of the wall. The contractors started placing the topsoil in the middle of the footing. ASEC recommended to remove the topsoil before any installation of baskets, as the topsoil is not structural fill. The grading crew spread approximately 8-to-12-inch lifts across the baskets and compacted using their sheep-foot roller. Density testing was performed, and test results were provided to the contractor. The wall crew has not been using their own equipment to compact this area. The wall crew damaged a drainage pipe with their skid steer, and it appeared that they tried to cover up the damage instead of replacing the pipe. ASEC documented this and informed the contractor that they need to replace the pipe. The wall crew watched as the grading crew hand shoveled the dirt around the pipe to fix the wall crew's damage. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
wall 1
2
damaged drain wall 1
3
pipeline
4
pipeline
5
topsoil in footing wall 1
6
wall 1
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel