Daily Field Report
Density test report
Date
*
Project Number
*
2026C103(NW PH 2, UNIT 4)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the grading contractor continue placing rockfill for unit 4 phase 3 in the deep slope embankment which was spread and tracked using a dozer and compacted with an off-road dump truck. The placement was suitably placed as per rockfill requirements. The contractor is moving rock fill to allow for additional drilling to blast. The drilling contractor continued drilling at building Lot #37. The paving contractor continued subbase and subgrade preparation at Nature Walk Boulevard placing contract base stone and clipping saturated subgrade soils and replacing with additional base stone. Base stone was also placed at low subgrade elevations saving time to add additional fill soils at subgrade. The pipe contractor also began installation of 30" CMP at unit 4 phase 3. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Sub grade prep. dumping base stone
2
sub grape prep. clipping of saturated soils
3
Compacting in place contract base stone
4
Drilled at lot # 37
5
Moving blast rock from blast lots
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel