Daily Field Report
Density test report
Date
*
Project Number
*
2025C186(Tom B. David Airport - Rehab Parallel Taxiway & Terminal Apron)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="257" data-end="398">Removal of soil was observed within the future Taxiway A4 area in accordance with previously established remediation requirements.</p> <p data-start="400" data-end="568">Placement of geotextile fabric continued, followed by installation of approximately 12 inches of No. 4 stone. Work progressed in an east-to-west direction (see photos).</p> <p data-start="570" data-end="787">It was observed that recycled Graded Aggregate Base (GAB) was placed along both sides of the A4 taxiway storm drainpipe (see photos). The recycled graded aggregate base (GAB) was compacted adjacent to the pipe using a jumping jack for compaction.</p> <p data-start="789" data-end="1099">During ongoing remediation activities for the Taxiway A4 and connector area at approximately Station 40+00, additional organic material, including tree remnants, were encountered. <span class="hover:entity-accent entity-underline inline cursor-pointer align-baseline"><span class="whitespace-normal">UES</span></span> was notified, and the condition is scheduled to be evaluated and addressed the following day.</p> <p data-start="1101" data-end="1135">No further observations were made.</p>
Upload Images
Image
Description
1
A3 taxiway facing West with #4s placed
2
removal of soil A4 East side
3
Excavation
4
A3 taxiway facing West
5
A4 future taxiway at connector
6
A3 #4 placement
7
A3 #4 placement
8
Compacting A4 storm drain sides
9
#4 placed on Geo-fabric
10
Storm drain material placement A4
11
Large organic material including trees and stumps
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel