Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="0" data-end="807">Concrete was placed at the retaining wall with a total volume of approximately 288 cubic yards. During the pour, concrete sampling testing was carried out in accordance with standard procedures, with one set of tests performed for every 100 cubic yards. A total of three (3) sets of six (6) specimens were cast and tested, including temperature, slump, and air meter tests. The first test recorded a temperature of 55°F, slump of 4 inches, and air content of 4%. The second test showed a temperature of 62°F, slump of 4 inches, and air content of 4.2%. The third test recorded a temperature of 65°F, slump of 6 inches, and air content of 4.5%.</p> <p data-start="809" data-end="1131" data-is-last-node="" data-is-only-node="">On the other side of the site, the crew continued working on Lots #20, 21, and 22, where fill material was placed in lifts of approximately 6–8 inches thickness. The material was compacted using a Caterpillar 815 compactor.</p> <p data-start="809" data-end="1131" data-is-last-node="" data-is-only-node="">Neighboring Buford area, the crew continued excavation activities through rock using a hydraulic excavator equipped with a rock grinder attachment, progressing to a length of approximately 10 feet and depth of 6-8ft and wide 8-10ft.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel