Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the pipe contractor continue to haul off stockpiled excavated blast rock at Nature Walk Parkway between sanitary sewer manholes #12 and 13 and dumping the rock fill at Unit 4 Phase 3 which was spread and compacted by Thompson Grading (for the later phase). Today's placement was observed to occur at elevation 917 thru 919. The placement was suitable was project rockfill requirements. The pipe contractor also continued installation of a 36" CMP storm line between A4 and A5. The blast contractor continued drilling at the roadway in the cul-de-sac at Unit 4 Phase 2. The paving contractor continued subbase preparation at Nature Walk Parkway between sanitary sewer manholes #6 and 4. The contactor also began subgrade preparation at the cul-de-sac roadway 1B. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Subbase prep.at Nature Walk Pkwy. between sanitary sewer #4 and6
2
3
4
Rock fill placement at unit 4 phase 3
5
6
Installation of 36"cmp storm between A4 and A5
7
8
9
Drilling at unit4 phase 2
10
Hauling off stock piled blast rock from Nature Walk
11
12
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel