Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C186(Tom B. David Airport - Rehab Parallel Taxiway & Terminal Apron)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="108" data-end="237">UES, CW Matthews, and Lead Edge were present for a proof-roll performed using a loaded tandem dump truck in the A3 extension area.</p> <p data-start="239" data-end="431">Observations during the proof-roll indicated that all areas performed acceptably, with the exception of an approximately 10-foot by 25-foot section near Station 43+00, which exhibited pumping.</p> <p data-start="433" data-end="734">A recommendation was provided by UES (Zach) to undercut the affected area an additional 6 inches, install geogrid throughout the compromised section, and backfill with a total of 18 inches of Graded Aggregate Base (GAB). The contractor completed the remediation in accordance with this recommendation.</p> <p data-start="736" data-end="939">Following the corrective work, an additional proof-roll was performed with the same parties in attendance. The remediated area performed satisfactorily, and all parties agreed the section was acceptable.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Placing GEO Grid
2
Depth of remediation
3
Backfilling with GAB
4
Completed
5
Proof roll
6
Testing with Gauge
7
Testing
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel