Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. A proof-roll was performed on Lots #71 through #83. The proof-roll was performed with a loaded off-road dump truck. There were no signs of severe pumping/deflection present, and the lots appear to be stable. The contractor will be grassing these lots on the following workday. The pipe crew continued installation of sewer line 5.2 to 5.3. This area is majority blasted rock and PWR. Visual inspections were performed to verify the backfilling process of this line. The contractor spread lifts of approximately 1 foot to 2 feet in size (due to rock size) and compacted using a vibrating sheep-foot roller. This section of the pipeline is unable to be density tested due to the presence of large rock. The grading crew continued to build up the slope along retaining wall 1. The grading crew excavated the remainder of the footing and ordered No. 57 stone and GAB for the remediation of the failed section of the footing. The temporary pond (above retaining wall 1) had the OCS removed and will begin to get filled over the next few workdays. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
proof roll
2
wall 1
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel