Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
<div class="relative basis-auto flex-col -mb-(--composer-overlap-px) pb-(--composer-overlap-px) [--composer-overlap-px:28px] grow flex"> <div class="flex flex-col text-sm pb-25"><section class="text-token-text-primary w-full focus:outline-none [--shadow-height:45px] has-data-writing-block:pointer-events-none has-data-writing-block:-mt-(--shadow-height) has-data-writing-block:pt-(--shadow-height) [&:has([data-writing-block])>*]:pointer-events-auto scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto" data-turn-id="request-WEB:90b7588c-7ec7-46e4-acce-7bd96715b91b-7" data-testid="conversation-turn-12" data-scroll-anchor="true" data-turn="assistant"> <div class="text-base my-auto mx-auto pb-10 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)"> <div class="[--thread-content-max-width:40rem] @w-lg/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn"> <div class="flex max-w-full flex-col gap-4 grow"> <div class="min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&]:mt-1" dir="auto" data-message-author-role="assistant" data-message-id="30cbf812-8ecb-416b-b077-ea4fcd5443ee" data-message-model-slug="gpt-5-3" data-turn-start-message="true"> <div class="flex w-full flex-col gap-1 empty:hidden"> <div class="markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling"> <p data-start="0" data-end="674">As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.</p> <p data-start="0" data-end="674">Crew continued working on Lots #63 and 64, where fill material was placed in lifts, spread using a crawler bulldozer, and compacted using both a sheep-foot roller and a Caterpillar 815. Density tests were performed, and the results met the required compaction specifications.</p> <p data-start="0" data-end="674">Fill material was placed in the area between Manholes A8 and A9 in lifts and compacted using a sheep-foot roller in preparation for sewer line excavation and installation. A mini sheep-foot roller was utilized near the retaining wall where access for larger equipment was limited.</p> <p data-start="847" data-end="995">At Wall 5, the crew prepared the footing by leveling the subgrade. Dynamic Cone Penetrometer (DCP) tests were conducted to evaluate soil strength.</p> Test 1: red silty sand clay<br data-start="1017" data-end="1020" />1st foot – 13 blows, 2nd foot – 14 blows, 3rd foot – 16 blows, 4th foot – 14 blows Test 2: red silty sand clay<br data-start="1190" data-end="1193" />1st foot – 11 blows, 2nd foot – 12 blows, 3rd foot – 11 blows, 4th foot – 11 blows <p data-start="1111" data-end="1626" data-is-last-node="" data-is-only-node="">At the Buford neighborhood site, the crew continued trench and manhole operations, including installation of a precast manhole structure with risers. The subgrade was prepared with No. 57 stone bedding, and a hole was cored into the riser using drilling equipment to facilitate pipe connection. Backfill material was placed and compacted, while additional temporary backfill was placed for stability, with further compaction to be completed in subsequent operations.</p> <p data-start="1111" data-end="1626" data-is-last-node="" data-is-only-node="">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.</p> </div> </div> </div> </div> </div> </div> </section></div> </div>
Upload Images
Image
Description
1
2
3
4
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel