Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C214(NW Unit 4 BRIDGE (Materials Testing))
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
asec (Ramchandra Mogulla)
Observations/Finding
Summary
*
<h2 data-section-id="1vampti" data-start="230" data-end="251">FIELD OBSERVATIONS</h2> <p data-start="253" data-end="636">On the above date, an AS Engineering and Consulting, LLC (ASEC) representative visited the site at the contractor’s request to <strong data-start="380" data-end="435">observe excavation and mud mat subgrade preparation</strong> along the <strong data-start="446" data-end="533">sheet pile wall located east of Pumpkin Vine Creek and along River Walk Manor Drive</strong>, in accordance with the project drawings, specifications, and prior coordination with the design team.</p> <p data-start="638" data-end="1145">Excavation was performed along the face of the installed sheet piles to expose the underlying material for <strong data-start="745" data-end="820">mud mat placement and interface with previously placed mud mat sections</strong>. Based on prior coordination with the bridge designer, the mud mat is intended to bear directly on <strong data-start="920" data-end="948">competent, clean bedrock</strong>. This requires removal of all overlying soil and debris and preparation of a clean rock surface, including <strong data-start="1056" data-end="1119">cleaning of the sides of previously placed mud mat sections</strong> to ensure proper contact.</p> <hr data-start="1147" data-end="1150" /> <h2 data-section-id="zm500y" data-start="1152" data-end="1174">TESTING AND RESULTS</h2> <p data-start="1176" data-end="1336">A total of <strong data-start="1187" data-end="1219">nine (9) excavation sections</strong> were observed along the sheet pile alignment. Bedrock was encountered at <strong data-start="1293" data-end="1315">varying elevations</strong> within each section.</p> <p data-start="1338" data-end="1620">In several locations, bedrock was encountered at or above the <strong data-start="1400" data-end="1451">proposed bottom of footing or mud mat elevation</strong>, consistent with prior observations. These conditions indicate that the <strong data-start="1524" data-end="1583">required 5-foot mud mat thickness may not be achievable</strong> in these areas without modification.</p> <p data-start="1622" data-end="1988">The exposed bedrock surface and previously placed mud mat were <strong data-start="1685" data-end="1729">observed for cleanliness and preparation</strong>. The contractor utilized <strong data-start="1755" data-end="1790">hand tools (shovels and brooms)</strong> to remove loose soil and debris and promote direct contact between the mud mat and the rock surface. The prepared surfaces appeared <strong data-start="1923" data-end="1960">acceptable for concrete placement</strong> at the time of observation.</p> <p data-start="1990" data-end="2300">The bedrock was observed to be <strong data-start="2021" data-end="2044">generally competent</strong> based on visual assessment. While vertical continuity of the rock surface could not be verified within the exposed sections, <strong data-start="2170" data-end="2202">prior subsurface exploration</strong> in this area indicates the presence of <strong data-start="2242" data-end="2272">competent residual bedrock</strong> at the observed elevations.</p> <p data-start="2302" data-end="2403">Photographs documenting the <strong data-start="2330" data-end="2372">excavation conditions and rock profile</strong> are included with this report.</p>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel