Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
ken.mosman@asec-na.com (Kenneth Mosman)
Observations/Finding
Summary
*
As requested, AS Engineering and Consulting (ASEC) has completed a verification of the rock quantity amounts determined by Elevate Drilling & Blasting LLC on March 18 and 19 (and referred to as Blast #5). Rock volume was determined based on the attached drill logs. Drilling was performed on <strong>March 18 and 19, 2026</strong>. Based on information provided by the contractor, a grid spacing of 8 feet was used. A total of 129 holes were drilled (88 on March 18 and 41 on March 19). The total quantity of mass rock shot on these days was calculated to be approximately <strong>2488.89 cubic yards</strong>. Also attached is a sketch of the approximate location for Blast #5. The green areas depicted refer to the drilling performed on March 18 and 19. The yellow area was an area previously drilled on February 17, 2026, that was drilled for exploratory purposes only. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel