Date
*
Project Number
*
2025C216(NW (Lots) Unit 4 PH 1A & 1B )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the paving contractor continue subbase preparation at Phase 1A and 1B and also at Nature Walk Parkway between sanitary sewer manholes #6 and 9. The contractor fine graded subbase stone wetting and compacted in place base stone. The grading contractor also continued subgrade preparation at Nature Walk Parkway between sanitary sewer manholes #10 and 11 undercutting approximately 8" to 12"of rocky subgrade materials in-place. The underlying subgrade materials are residual from blast rock and should be suitable for subbase stone placement without additional undercut if base rock is placed in a timely manner preventing surface materials from drying out causing loose surface silts. Also, equipment and truck traffic should be limited across this area prior to placing base stone. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Subgrade prep.at Nature Walk Pkwy. undercutting 8" to 12"
2
3
4
Subbase prep.at Nature Walk Pkwy. showing sufficient depth for asphalt.
5
6
Subbase prep.at phase 1A
7
Subbase prep.fine grading at Nature Walk Pkwy.
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel