Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="159" data-end="482"><strong data-start="159" data-end="170">Area 1:</strong><br data-start="170" data-end="173" />Topsoil was removed from the designated location. At the owner’s request, excavation was halted in the area where the proposed drain was to be installed due to the presence of structural straps attached to the existing wall. Per the owner’s direction, no underground drain will be installed along this wall.</p> <p data-start="484" data-end="573">The west side of Area 1 was prepared for future placement of GAB (Graded Aggregate Base).</p> <p data-start="575" data-end="841"><strong data-start="575" data-end="586">Area 4:</strong><br data-start="586" data-end="589" />Excavation commenced for the trench required to install a future drain along the wall. Temporary straps attached to the existing wall were encountered during excavation. According to AtlNext, these straps are temporary, and work proceeded as planned.</p> <p data-start="843" data-end="958">Excavated soil was stockpiled nearby. A soil sample was collected and delivered to the ASEC laboratory for testing.</p> <p data-start="960" data-end="1123"><strong data-start="960" data-end="976">Runway Area:</strong><br data-start="976" data-end="979" />ABC Contractors performed coring operations around the existing runway centerline lights.</p> <p data-start="960" data-end="1123">Installation of sheet piles into the ground has begun.</p> <p data-start="960" data-end="1123">No further observations were made.</p>
Upload Images
Image
Description
1
Area 4 excavation
2
Coring truck (ABC Contrators)
3
Coring around existing Lights
4
Sheet piles being installed
5
excavation
6
Preparing for GAB Area 1
7
Sheet pile installation
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel