Daily Field Report
Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="134" data-end="352"><strong data-start="134" data-end="145">Area 2:</strong><br data-start="145" data-end="148" />Excavation continued using a Caterpillar 349F excavator to an approximate depth of 10 feet and a length of 200 feet. Primer was applied to the wall, followed by installation of a waterproofing membrane.</p> <p data-start="354" data-end="552">Approximately 6 inches of No. 89 stone was placed around a 4-inch black corrugated pipe with sleeve. The pipe installation was coordinated with on-site surveyors to verify proper slope for drainage.</p> <p data-start="554" data-end="757"><strong data-start="554" data-end="565">Area 4:</strong><br data-start="565" data-end="568" />Excavation activities continued. Primer and waterproofing membrane were applied to the existing wall within the trench, which measures approximately 11 feet in depth and 175 feet in length.</p> <p data-start="759" data-end="839"><strong data-start="759" data-end="770">Area 3:</strong><br data-start="770" data-end="773" />Sheet piles were installed, and topsoil was removed from the area.</p> <p data-start="841" data-end="949"><strong data-start="841" data-end="852">Area 6:</strong><br data-start="852" data-end="855" />Sheet piles were installed. No excavation activities have commenced in this area at this time.</p> <p data-start="951" data-end="1182"><strong data-start="951" data-end="962">Area 5:</strong><br data-start="962" data-end="965" />ABC Contractors were on site and drilled an approximately 6-inch diameter hole through the wall for drainage at a depth of about 3 feet. The trench excavated measured approximately 3 feet deep and 95 feet in length.</p> <p data-start="1184" data-end="1277">Approximately 6 inches of No. 89 stone was installed around a 4-inch sleeved corrugated pipe.</p>
Upload Images
Image
Description
1
Area 3
2
ARea 5
3
Area 4
4
Primer adhesive
5
Area 4
6
ARea 4
7
Waterproof specification sheet
8
ARea 4
9
Area 5 Hole drilled through wall for drain
10
Waterproof specification sheet
11
Sheet piling installation
12
ARea 5
13
Area 2 excavation
14
Area 3 trench
15
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel