Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="120" data-end="577"><strong data-start="120" data-end="130">Area 1</strong><br data-start="130" data-end="133" />Excess soil was removed from the site. A concrete box (Type B inlet) was installed adjacent to an existing drainage structure. An approximately 26-inch core was drilled into the side of the existing structure to connect the two systems. M10 sand was placed and compacted using a trench packer. Compaction testing was performed with a Troxler 3430 (refer to testing report). Topsoil was then delivered and placed using a cultipacking attachment.</p> <p data-start="579" data-end="863"><strong data-start="579" data-end="589">Area 3</strong><br data-start="589" data-end="592" />Upon arrival, the final lift had been placed and was undergoing compaction with a ride-on vibratory sheepsfoot roller. Compaction testing was performed using a Troxler 3430 (see testing report). Following successful completion of the final lift and testing, topsoil was delivered to the area.</p> <p data-start="865" data-end="1379"><strong data-start="865" data-end="875">Area 4</strong><br data-start="875" data-end="878" />On the west side of Area 4, backfill for the second lift above the drain pipe was tested after compaction and determined to have excessively high moisture content (see testing report). The material was removed and replaced; however, the replacement soil also exhibited unacceptable moisture levels. Upon recommendation from 2MNext, graded aggregate base (GAB) was mixed with the existing soil to reduce overall moisture content. Refer to the testing report for results. Excess soil was hauled offsite.</p> <p data-start="1381" data-end="1433"><strong data-start="1381" data-end="1391">Area 6</strong><br data-start="1391" data-end="1394" />Graded aggregate base (GAB) was placed.</p>
Upload Images
Image
Description
1
Testing Area 4
2
Backfilling Area 4
3
Testing area 1
4
Area 1
5
Area 1
6
Area 4
7
Mix used to for collar area 1 drain
8
Area 1
9
Area 1 box placement
10
Compacting
11
Area 1
12
ABC Coring for location 1 drain box
13
Pipe used between boxes area 1
14
Hauling out extra material
15
compacting
16
compacted area
17
Cultipacking
18
Cultipacking
19
Soil removal
20
spreading topsoil
21
Testing
22
Hauling out soil
23
Compacting
24
Compacted area
25
Testing
26
Preparing
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel