Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day: <p data-start="116" data-end="322"><strong data-start="116" data-end="126">Area 1</strong><br data-start="126" data-end="129" />The area was prepared for sod placement, and sod was installed on the east side. Concrete was placed for a Type B drain collar. The collar form and rebar placement was observed by 2MNext and AtlNext. Topsoil was placed, and curb repairs were completed (see photos).</p> <p data-start="324" data-end="537"><strong data-start="324" data-end="334">Area 2</strong><br data-start="334" data-end="337" />Backfilling over the sheet piles was completed using graded aggregate base (GAB) and compacted with a trench packer. Compaction testing was performed (see testing report). Sod was subsequently placed.</p> <p data-start="539" data-end="728"><strong data-start="539" data-end="549">Area 3</strong><br data-start="549" data-end="552" />GAB was placed for the final lift, moisture-conditioned with added water, and compacted using a trench packer. Compaction testing of the GAB was completed (see testing report).</p> <p data-start="730" data-end="993"><strong data-start="730" data-end="743">Area SG14</strong><br data-start="743" data-end="746" />A flume and drain collar were formed, and concrete was placed. Concrete testing was performed (see testing report). All collars and the flume, including rebar placement, were observed by 2MNext and AtlNext prior to concrete placement.</p> <p data-start="995" data-end="1081"><strong data-start="995" data-end="1005">Area 6</strong><br data-start="1005" data-end="1008" />A cultipacker was utilized to prepare the surface prior to sod placement.</p>
Upload Images
Image
Description
1
form/rebar collar area 1 observed by 2MNext and AtlNext before concrete placement.
2
Placed concrete Collar area 1
3
Flume
4
completing collar next to flume
5
Formed/rebar Collar next to flume observed by 2MNext and AtlNext before concrete placement.
6
Concrete testing
7
Curb repair area 1
8
Testing
9
Adding water to GAB
10
Preparing area
11
Testing
12
Formed Flume
13
Testing
14
Compacting
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel