Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C187(Lee Gilmer Memorial Airport - Rehab Terminal Area Apron PH 3)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (CWM) and for the observation/testing of the placement of asphalt. ASEC met with Shawn Cyr of CWM, Anthony Holt of CWM, Josh York of CWM, and Anthony Esspeedo of Lead Edge to discuss the cracking that has been present during the last two days of paving. CWM decided to attempt to heat the cracks with a torch and reroll these areas with a smooth drum roller to seal the cracks. This appeared to help but not completely fix the issue. An adjustment to the roll pattern was made to try to reduce cracking as much as possible. Lead Edge decided to continue forward with paving due to passing density results, even though the cracking was present. The contractors milled between Hangars D and E. This area was paved and ASEC spot checked density tests during paving to verify the contractors were properly compacting this area. The contractors also paved two lanes in the parking space located by Hangar L. The roll pattern for the rubber tire roller was increase and appeared to help seal the cracks. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
fabric and tack
2
subgrade
3
milling
4
test results
5
site plans
6
taxiway
7
taxiway
8
cracking on taxiway
9
paving
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel