Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C101(Seven Hills PHASE 13, UNIT 3 Lots)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the grading contractor, Thompson excavate to subgrade for the deceleration lane on Seven Hills Boulevard to Seven Hills Phase 13. The subgrade was undercut -25" below top of existing curbing to (down to residual materials) which were suitable for required compaction. The in-place materials were observed by probing using a rounded end steel rod that were also observed by the Paulding County official Mr. Mike Kenner who approved the results. During excavation, utility fiber lines were uncovered and were excavated around to prevent damage. Due to the size of the excavation and utilities in place it was recommended not to proof-roll subgrade soils with possibilities of damaging utilities. The approximately linear feet observed and approved today was 120 feet with recommendation to place base stone 12" in depth pushing across utilities and the subgrade being careful not to damage the utilities. Also, the tapered end requiring class B concrete was agreed to be placed full depth. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Excavated subgrades at deceleration lane showing observation by probing with utilities in place.Also showing depth excavated of 25" from top of curb.
2
3
4
5
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel