Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="0" data-end="566">Designated locations for coring were marked and core drilling operations were performed using a core cutter at each selected joint location. After drilling, the core samples were carefully removed, measured for joint width and thickness, labeled for identification, and documented for reporting purposes. The drilled holes were then cleaned using compressed air to remove loose debris and dust. After cleaning, foam backer rod and silicone sealant were installed, and all openings were sealed following completion of the coring activities.</p> <p data-start="568" data-end="750">A total of 18 cores were obtained from various locations across the project area. Of these, 17 cores were taken from construction joints and 1 core was taken from an expansion joint.</p> <h3 data-section-id="sgwwwx" data-start="752" data-end="787">Core Locations and Measurements</h3> <h4 data-start="789" data-end="832">Ramp 5 East Entrance Lane at Taxiway L</h4> <ul data-start="833" data-end="925"> <li data-section-id="13ktfs1" data-start="833" data-end="861">L1 – Expansion Joint: 1.0”</li> <li data-section-id="emcuzm" data-start="862" data-end="893">L2 – Construction Joint: 0.5”</li> <li data-section-id="1d52dhf" data-start="894" data-end="925">L3 – Construction Joint: 0.5”</li> </ul> <h4 data-start="927" data-end="976">Taxiway L between Taxiway D and Ramp 6 South</h4> <ul data-start="977" data-end="1072"> <li data-section-id="1shrp8l" data-start="977" data-end="1008">L4 – Construction Joint: 0.4”</li> <li data-section-id="rzd5tz" data-start="1009" data-end="1040">L5 – Construction Joint: 0.7”</li> <li data-section-id="mb1edh" data-start="1041" data-end="1072">L6 – Construction Joint: 0.6”</li> </ul> <h4 data-start="1074" data-end="1131">Taxiway D Lane between Ramp 6 North and Ramp 8 North</h4> <ul data-start="1132" data-end="1392"> <li data-section-id="1ha8vn0" data-start="1132" data-end="1163">D7 – Construction Joint: 0.6”</li> <li data-section-id="t26jhc" data-start="1164" data-end="1195">D8 – Construction Joint: 0.5”</li> <li data-section-id="14hn3ep" data-start="1196" data-end="1227">D9 – Construction Joint: 0.5”</li> <li data-section-id="9lc4xm" data-start="1228" data-end="1260">D10 – Construction Joint: 0.6”</li> <li data-section-id="1a3qoc8" data-start="1261" data-end="1293">D11 – Construction Joint: 0.5”</li> <li data-section-id="12fqlaz" data-start="1294" data-end="1326">D12 – Construction Joint: 0.5”</li> <li data-section-id="3x12t6" data-start="1327" data-end="1359">D13 – Construction Joint: 0.5”</li> <li data-section-id="1rgilh8" data-start="1360" data-end="1392">D14 – Construction Joint: 0.4”</li> </ul> <h4 data-start="1394" data-end="1426">Taxiway between L12 and L14</h4> <ul data-start="1427" data-end="1558" data-is-last-node="" data-is-only-node=""> <li data-section-id="1btnj9z" data-start="1427" data-end="1459">L15 – Construction Joint: 0.6”</li> <li data-section-id="145ng6s" data-start="1460" data-end="1492">L16 – Construction Joint: 0.6”</li> <li data-section-id="5mxxpy" data-start="1493" data-end="1525">L17 – Construction Joint: 0.5”</li> <li data-section-id="1golivv" data-start="1526" data-end="1558" data-is-last-node="">L18 – Construction Joint: 0.7”</li> </ul> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel