Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C101(Seven Hills PHASE 13, UNIT 3 Lots)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the pipe contractor continue installing 8" sanitary sewer line between manholes #11 and 12 and compacting between manholes #10 and 11. The backfill was observed by probing using a 3/8" diameter rounded end steel rod with plans to have a technician perform density tests on 6/12/26. It was also recommended to the grading contractor to scarify in-place fill placed for Lots #27 and 28. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Compacting fill at sanitary sewer line between manhole # 11 and 12
2
Compacting between #10 and 11
3
Probing in place fill between # 11 and 12
4
5
6
7
Existing subgrade conditions at roadway
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel