Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C216(NW (Lots) Unit 4 PH 1A & 1B )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor and for the observation/testing of the placement of fill/backfill. The grading contractors placed lifts of approximately 1 foot to 1.5 feet in thickness across the roadway at approximately station 4900-5000 (near the entrance of the site). During this time, a brief rainstorm hit the site. All the other contractors (pipe and bridge) left the site, but the grading crew continued to work. ASEC performed density testing in this area. Tests failed, and the contractor said they were going to still work. In-situ moisture contents were too high. Once ASEC notified management, the contractors came back and cut out the failing test areas and spread the wet soil out to the slope alongside of the roadway. The contractor began to remove the wet soil from the surface of their cut area and began to excavate from a lower elevation to obtain a more suitable moisture content for the soil. Retests were performed on the drier material with passing test results. The pipe crew ran over the grading crews GPS system. The grading crew has been placing soil in areas they know are low by at least 2 to 3 feet or more. At this time, the grading crew will have to stop until a new GPS system is calibrated to the site. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
bridge
4
bridge
5
rain
6
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel