Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C101(Seven Hills PHASE 13, UNIT 3 Lots)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe the grading contractor (JW) continue subgrade preparation by undercutting existing saturated sub grade soils for the roadway. The subgrade was probed using a 3/8" diameter rounded end steel rod and recommendations were made to undercut -8" and replace with additional base stone (GAB) compacting to 98%. The first forty feet was undercut -8" and remaining areas being observed was recommended to clip -6" replacing with additional base stone. The subgrade area observed today was just past the mailbox Kiosk drive. The contractor only undercut and clipped subgrade areas today (did not place any base stone). We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Undercutting and clipping existing saturated sub grade soils -8" to -6",observing by probing using a rounded end steel rod.
2
3
4
5
Fuel truck observed on sub grade with no movement after clipping.
6
Showing depth of undercut
7
8
Probing using a rounded end steel rod
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel