Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C125(Pittman Park - Garibaldi St. Stormwater)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor and for the observation/testing of the placement of fill/backfill. The contractors removed approximately 20 feet to 30 feet (in length) of the unsuitable fill materials in the roadway on Garibaldi Street. The contractors went against ASEC recommendations and decided to bring soil from another site to use as fill in this area. ASEC did not have a proctor for this soil, so a field proctor was performed, and a sample was taken to our laboratory to perform a moisture-density relationship (proctor). The soil appears to be a silty material with a mixture of No. 57 stone. The contractor placed this material in approximately 8-to-12-inch lifts and compacted using a trench roller. Density testing was performed, and test results were provided to the contractor. The soil appears to be slightly higher than optimum moisture content, but the density tests were passing at this time. County officials were present onsite and stopped work due to lack of road plates and soil being placed on roadway. A concrete pour of approximately 27 cubic yards was placed for the footing for the retaining wall located at the entrance of the site. Concrete testing was performed and test results were provided to the contractor. Six (6) cylinders were cast and stored on site, and will be transported to our lab on the following day. The initial slump test of the first truck was approximately 7 inches which does not fall within job specifications. The concrete foreman was notified and requested 2 additional slump tests. Results of both slump retests were 7 inches. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel