Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and observed the Paving contractor continue placing base stone at Nature Walk Parkway between sanitary sewer manhole # 12 and 14.The writer also monitored traffic from other sub contractors traveling on existing sub grade prior to base stone being placed.The additional traffic is causing moderate rutting and scabbing with decisions being made to clip or roll down to stabilize.Additional observations will be made during proof roll of sub base stone. The Grading contractor continues to place fill at unit 4 and phase 3, also repairing reels at eroded slope areas.The fill placement is also being monitored and tested by another technician from ASEC. The wall contractor continued installing reinforcing steel at bridge floor slab.
Upload Images
Image
Description
1
Placing re steel at bridge floor slab
2
Blading down ruts and scabbing from additional traffic from sub contractors
3
4
Placing sub base stone over existing sub grade
5
Additional traffic from sub contractors rutting sub grade
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel