Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and observed the Paving contractor continue to place base stone over existing sub grade at Nature Walk Parkway between sanitary sewer manholes #12 and 14.The writer continued to monitor additional traffic from sub contractors which caused additional repairs being needed on sub grade to place sub base stone. The Grading contractor continued placing fill at unit 4 phase 3 which was monitored and tested by another technician from ASEC. The wall contractor continued to place re steel at bridge floor slab.
Upload Images
Image
Description
1
Placing sub base stone and compacting
2
3
4
Additional sub contractors traffic on sub grade causing additional repairs needed.
5
6
7
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel