Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and met with the Paving contractor (NWGP) to observe sub grade and sub base conditions after recent rain event.The remaining sub grade approximately 150' both sides of roadway appeared too wet with rutting observed from sub contractors traffic.With additional rain forecasted for today it was decided not to repair and place additional base stone on today,The Paving contractor reminded onsite setting grade stakes and blading roadway. Also the writer observed the Grading contractor backfilling poured curbing at round about. The writer also also observed the Wall contractor installing reinforcing steel at bridge panels.
Upload Images
Image
Description
1
Observation of reinforcing steel being installed at bridge panels
2
3
4
5
Backfill at round about curbing
6
Paving contractor installing grade stakes at Nature Walk
7
Observation of sub grade after rain event at Nature Walk
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel