2025C214(NW Unit 4 BRIDGE (Materials Testing))
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and observed the Wall contractor (RWS) continuing to install reinforcing steel at bridge panels.The contractor also completed form work wall pour at dead man footing. The writer also observed site conditions at Seven Hills phase 13,several areas had severe saturated eroded conditions. The writer also observed the Pipe contractor (Savannah) continue installing 18" storm line between structures Y2 and Y3. Also the writer observed the eroded sub base conditions at Nature Walk parkway between sanitary sewer manholes #12 and 13 requiring repairs at curb lines.
Upload Images
Image
Description
1
Eroded sub base stone at Nature Walk curb line between sanitary sewer manholes #12 and 13
2
3
Saturated sub grade conditions at Nature Walk Pkwy.
4
Severe erosion conditions at Seven Hills phase 13
5
6
Continuing reinforcing steel installation at bridge panels and barrier walls
7
8
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel