Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p class="font-claude-response-body break-words whitespace-normal" dir="auto">Crew 1 – Temporary Pond (Between Lots 23 & 24)</p> <p class="font-claude-response-body break-words whitespace-normal" dir="auto">Observed ongoing excavation of saturated material at the temporary pond location between Lots 23 and 24. Wet soil was being removed to a depth of approximately 6–8' and spread across the adjacent lots to allow it to dry out before further use. Hauling and spreading of the wet material to the drying area was confirmed in progress at the time of the visit.</p> <p class="font-claude-response-body break-words whitespace-normal" dir="auto">Crew 2 – Manhole CB8.6 to CB8.7 / CB8.7 to CB8.8</p> <p class="font-claude-response-body break-words whitespace-normal" dir="auto">At CB8.6 to CB8.7, 24" HDPE pipe installation was complete of length 49'. Backfill had been placed over the pipe and compaction was underway using a trench compactor along the pipe alignment. At CB8.7 to CB8.8, the trench had been excavated to the required depth, and installation of 18" RCP of length 120' was in progress. The joint between the pipe and the structure was being sealed/grouted. Following placement, fill material was placed and compacted around the pipe using a jumping jack compactor.</p> <p class="font-claude-response-body break-words whitespace-normal" dir="auto">Crew 3 – Manhole CB10.3 to CB10.4 / CB10.4 to CB11.1</p> <p class="font-claude-response-body break-words whitespace-normal" dir="auto">At CB10.3 to CB10.4, 30" HDPE pipe was already installed of length 81' and No. 57 stone placed around and over the pipe. At CB10.4 to CB11.1, of 18" RCP of length 27' had been installed and backfilled with soil. Compaction was being carried out using a jumping jack compactor for the pipe zone and a trench compactor for the upper lifts.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel