Daily Field Report
Density test report
Date
*
Project Number
*
2025C214(NW Unit 4 BRIDGE (Materials Testing))
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and assisted in monitoring testing concrete placement at dead man footing east side wall.One set of (6) 4x8 test cylinders were made for 50 cubic yards pour. The writer also continued observation of reinforcing steel being installed at bridge slab panels.Recommendations made was move vertical bars off top of nelson stubs in panels for sufficient clearance.Also complete clean up of trash and debris off panels.The writer also observed added #6 bars(vertical)under support plate holding threaded dowel bolts for hanging the sanitary sewer line under bridge.
Upload Images
Image
Description
1
Monitoring concrete pour and testing at dead man footing wall
2
3
4
Observation of reinforcing steel in place at bridge slab panels according to site document in title Bridge Deck,dated 2/20/26.Drawing No. R3.0
5
Vertical #6 bars added at support bolts for hanging sanitary sewer line
6
7
8
9
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel