Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was onsite as requested and observed the Curbing contractor begin pouring curbing (type 2) at roadway to culdesac at Seven Hills phase 13 until curbing machine broke and pour ended.The contractor continued pouring sidewalk on Seven Hills Boulevard. The writer also assisted in observing concrete placement at bridge cart path ,raised island and north side curbing.Also observing installation of tension rods attached to dead man footing wall. The writer also observed the Paving contractor( NWGP) continue sub grade prep.at Nature Walk Pkwy.end of Phase 1.The sub grade was clipped an extra -4" to removed saturated sub grade soils as recommended.The contractor placed additional base stone that was clipped from existing sub base previous placed.Also performed additional density checks on in place binder asphalt mix at Nature Walk pkwy.intersection to Phase 1B and 1B roadway.The writer also set up a meeting with NWGP asphalt group to discuss discrepancies at previous placed asphalt binder mix.Several density check readings were below a required compaction effort of 92% based on an estimated theoretical value of 154.0 No actual value was provided.Readings:142.5,140.6.151.2,144.8,137.4,133.2,130.4,127.7 and 141.6. The writer also observed the Grading contractor continue hammering residual rock at building lots.
Upload Images
Image
Description
1
Pouring curbing at Phase 13 prior tobreak down
2
Pouring curb side at bridge
3
Poured curb at Phase 13
4
Density checks at Nature Walk previous binder asphalt mix placement
5
6
7
8
9
Sub grade observations at Nature Walk end of Phase 1
10
11
Poured Path cart at bridge
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel