Daily Field Report
Density test report
Date
*
Project Number
*
2025C214(NW Unit 4 BRIDGE (Materials Testing))
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was onsite to assist in observing and sampling during the concrete pour for the second wall pour for the dead man footing. The contractor placed approximately 58 cubic yards 0f 5000 psi mix. Two (2) sets of six 4 x 8 cylinders were molded during the concrete pour. Observed the paving contractor continuing repairs for the Naturewalk parkway subbase stone between sanitary sewer manholes #12 and 14. The contractor replaced washed subbase stone that had eroded from the curb line. The subbase stone was compacted and was suitable for concrete placement. Observed the grading contractor continue placing fill for the Unit 4 phase 3 building lots. The fill being placed today was for the top four feet of building Lots #132 through 136 and was observed having compaction efforts below the required specification of 95%. The contractor was allowed to continue placing lifts of fill with the understanding that in-place fill would be re compacted at a later date after scarifying and aerating has occurred. This area will be retested at that time. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Sub base prep.replacing eroded stone at curb line
2
3
4
Pumping 5000 psi concrete mix at second wall pour at dead man footing 58 yards
5
6
Sub base prep.
7
Second wall pour
8
Fill placement at Unit 4 phase 3 to re compact and test at later date.
9
10
11
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel