Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative met with sub-contractors for paving, grading and curbing to discuss current subbase conditions concerning repairs for occurring erosion issues at Naturewalk parkway due to recent consistent rain events. The writer recommended using a lean concrete mix to fill eroded subbase reels that had occurred at the curb line and washed conditions at previous poured curbing which has recently been undermined. The sub-contractors elected to continue standard repair measures replacing eroded areas with GAB stone and adding check dams using silt fence. This should be sufficient if rain doesn't occur prior to curb placement. There may be additional repair measures required at previous poured curbing. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Eroded areas at curb line
2
Sub base prep. and check dam installations
3
Eroded curb line
4
Site condition at Nature walk Pkwy.sub grade after rain event near west side of bridge
5
Wall contractor stripping form work at second wall pour at dead man footing
6
7
Washed erosion at parkway
8
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel