Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C214(NW Unit 4 BRIDGE (Materials Testing))
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
russell.hendrix@asec-na.com (Russell Hendrix)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes,and materials submittals. The following observations were observed on site this day. <p class="isSelectedEnd">Upon arrival at the Mt. Moriah side of the bridge construction, soil was being placed using a Caterpillar 326 excavator and a skid steer. A remote-controlled trench packer was used adjacent to the dead-man wall to minimize the potential for wall disturbance, while a Bomag 145PDH ride-on vibratory sheep-foot compactor was used to compact the remaining fill.</p> <p class="isSelectedEnd">The first lift, measuring approximately 12 inches in thickness, was completed at an elevation approximately 5 feet below the top of the retaining wall. A 3/8-inch probe rod was used to evaluate the lift, with an average probe depth of approximately 2 inches observed.</p> <p class="isSelectedEnd">A second lift, also approximately 12 inches thick, was placed at an elevation approximately 4 feet below the top of the dead-man wall. Compaction of this lift had not been completed at the time the technician departed the site.</p> Additional soil was placed behind the dead-man wall (see photo). Soil was also placed beneath the bridge; however, compaction of this material had not been performed while the technician was on site. No further observations were made. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Wing wall backfill
2
Excavator moving soil
3
support retaining wall
4
compacting
5
compacting
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel