Density test report
Date
*
Project Number
*
2026C101(Seven Hills PHASE 13, UNIT 3 Lots)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was onsite to observe the grading contractor Thompson blade off saturated in place fill soils (at Seven Hills phase 13) and begin replacing with suitable drier materials. The writer observed the removed saturated soils by probing to suitable compacted fill materials. The writer also observed the beginning of the replacement fill. The curbing contractor continued forming and pouring curbs and throats for the roadway. The writer observed reinforcing steel placement at curb throats which appeared to be in compliance with job specifications for rebar size, spacing and quantity. The grading contractor also continued hammering rock at the detention pond and placing rock fill for the embankment slope. The wall contractor (RWS) began backfilling at the outside dead man footing wall. Our representative observed fill placement being compacted using a vibratory sheep-foot roller between +3 and +5 feet of placed fill. The fill was probed using a rounded end steel rod and appeared suitable for the compaction requirements of 95%. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Poured throat at phase 13
2
Fill re placement at lots 33 and 34
3
4
Compacting fill at dead man footing wall
5
Recommending additional compacting efforts at wall backfill
6
7
Observation of reinforcing steel at throats phase 13
8
9
Observation of subgrade after removal of in place saturated fill soils,approved for additional fill placement
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel