Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2023C159(Airfield Repairs 2021-23)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Ganesh Undavalli (Narayana Ganesh Undavalli)
Observations/Finding
Summary
*
<p class="isSelectedEnd">On the above date, an AS Engineering and Consulting, LLC (ASEC) representative visited the site at the contractor's request to <strong>observe excavation and subgrade preparation activities</strong> associated with the airfield repair work at <strong>Taxiway Golf</strong>, specifically along the <strong>slope on the north side of Taxiway Golf</strong>, in accordance with the project drawings and specifications.</p> <p class="isSelectedEnd">Prior to excavation, the contractor <strong>marked the limits of the proposed work area</strong>. The contractor then performed grading and excavation to an approximate depth of <strong>36 inches</strong> for construction of the proposed <strong>concrete drainage structure and associated drain pipe</strong> along the north slope of Taxiway Golf.</p> <p class="isSelectedEnd">Excavated soil was removed from the work area using a <strong>tandem-axle dump truck</strong>. Following excavation, the exposed subgrade was leveled and compacted using a <strong>trench compactor</strong> in preparation for subsequent construction activities.</p> <p class="isSelectedEnd">No density testing was reported as being performed by ASEC during these activities on this date.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
slop area
2
concrete structure
3
Marked area to excavate
4
Excavating Area
5
soil extracted from the marked area
6
compacting excavated area using trench packer.
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel