Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2026C101(Seven Hills PHASE 13, UNIT 3 Lots)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was onsite to observe the grading contractor continue placing fill for the south side of Lots #33 and 34. It was recommended after probing the existing subgrade (using a rounded end steel rod which appeared stable and suitable for additional fill placement) using imported residual soils from across the creek instead of onsite clipped materials from lots having large amounts of grass. It was also recommended to continue blading and compacting the north side of lots to lower moisture content prior to placing additional fill. The writer also observed the pipe contractor Savannah begin installing 8" ductile iron water line across Plantation gas lines which was double wrapped using a 8 mil LLDPE material. The installation was observed by the Plantation Gas official. The writer also observed backfilling of water lines installed over gas lines where compacting efforts were limited due to vibrations over the gas lines. The compaction efforts were probed and estimated at 91% to 92% behind curb lines which should be sufficient for grass area. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
8" ductile water line double wrapped installed over gas lines.
2
3
4
Probing in place fill at lots 33 and 34
5
Clipped materials with lots of grass not recommended for structural fill placement
6
Observation of existing sub grade at lots 33 and 34.
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel