Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
Admin(Administrative - Non Billable)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was on site as requested at 145 Rosemary Landing project #887082 for inspection at footings/slab.The footings were observed by probing the bottoms using a rounded end steel rod at intervals of two to three feet.The in place fill and residual soils appeared suitable for a design bearing pressure of 3000 psf,The writer also observed reinforcing at continuous wall footings and floor slab reinforcing (2 # 4 continuous bars in place at all required locations.Lot number ,1074 NatureWalk @Seven Hills
Upload Images
Image
Description
1
Continuous exterior wall footings
2
Floor slab footings
3
4
Continuous reinforcing steel in place
5
Building permit
6
Probing bottom of footings
7
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel