Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative observed proof-rolling of subbase stone at the roundabout tie-in to the Nature Walk bridge with members from the paving contractor and Paulding County. The proof-roll was observed using a loaded tandem dump truck. The subbase appeared stable under traffic with no apparent severe movement. The subbase was approved for curbing placement and asphalt paving. The writer also observed fill placement and performed density tests at Unit 4, Phase 3 using a Troxler Nuclear gauge model 3430, serial no. 91643. The curbing contractor also continued installing inlet throats at the Unit 4, Phase 2 main drive. The writer observed a total of ten tops with reinforcing in place according to specifications for size, spacing and quantity. The contractor poured nine tops today. The writer observed the pipe contractor Savannah continue installing 24" RCP storm line between structures B 5.1 and B 5.2. Compaction results were in compliance with project specifications. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Bacckfill at 24" rcp storm between B 5.1 and B 5.2
2
Fill placement and density tests performed at Unit 4 phase 3.
3
4
5
Reinforcing observed at Unit 4 phase 2 throats
6
7
Installation of 24" rcp storm line
8
9
Proof roll of subbase at Nature Walk roundabout
10
11
Truck ticket
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel