Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative observed the curbing contractor continue subbase preparation for the east side exit drive from the bridge abutment pouring curbing using a 3000-psi concrete mix. The writer also observed the grading contractor Thompson continued subgrade preparation at the roadway to Unit 4, Phase 2 after a rain event 10/04/26. The contractor bladed the subgrade and compacted using a vibratory sheep-foot roller. The contractor also continued fine grading and subgrade preparation at the amenity parking lot. The pipe contractor Savannah installed electrical conduit crossing roadway to Unit 4, Phase 2. The curbing was severely damaged requiring repairing and additional compacting efforts. The electrical contractor Mastec was on site today and began installing electrical conduits at Unit 4, Phase 1A. The writer observed the excavation and reminded the contractor that compacting efforts were recommended. The contractor stated he's using the backhoe excavator to track in for compaction. This response will be mentioned to our client. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Compacting subgrade using backhoe
2
3
Pouring curbing at exit drive from east side bridge abutment
4
Installing electrical conduit across roadway at Unit 4 phase 2,where curb is severe damaged.
5
6
Subgrade prep.at roadway Unit 4 phase 2
7
8
9
Subbase prep.for curbing pour at exit drive east side of bridge abutment
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel